Ram Air Door Actuator (RADA) installation

Effectivity: Global 7500 aircraft  

ATA 36-11 

By: Pierre Bergeron – Technical Services

After installing the Ram Air Door Actuator (RADA) task BD700-A-J36-11-19-00AAA-720A-A, a rigging procedure task BD700-A-J36-11-19-00AAA-275A-A is required. Although, in general, a safety cable is an equivalent means of a locking device, the jam nut shall be secured with lockwire MS20995C20 after a RADA installation/rigging is carried out.   

If a safety cable is installed, the end stud may contact the actuator end bushing when the shaft is fully retracted. 

The lefthand image is shown with a safety cable and the righthand image is shown with a regular lockwire.  

A note will be added to the Aircraft Maintenance Publication to use lockwire only. The revision is scheduled for July 22, 2022. 

Previous
Previous

Proper operation of Dado Mounted Table

Next
Next

Windshield rain repellent coating